Muwaffaq Salti Air Base, Jordan, UD 2.4-Package NO.1
The Outcome
HZE was contracted to work alongside The Morganti Group to install the first high-temperature lining system in Jordan. The project took place in The Life Support Area (LSA) of Muwaffaq Salti Air Base and was completed in the year 2020.
We achieved final acceptance after the integration of the HDPE black smooth 2 mm high-temperature liner. It was installed across 6,000.00 square meters of the operational area. The project was successfully completed in compliance with international standards.
Description
The Process
Project Overview
HZE took on the responsibility of supplying the Muwaffaq Salti Air Base in Amman-Jordan with HDPE 2 mm lining. Our establishment further participated in the project by installing this high-temperature lining system across 6,000 m2 of land area. As per the contract, final testing for efficiency and compliance was also concluded by our company.THE REQUIREMENTS
Every project features unique needs. For example, lining systems vary with each object, in layer count, thickness and type. We meet and exceed them.
HZE has been a leading supplier & installer of geosynthetic lining systems for over 40 years. We adhere to international standards and offer competitive pricing.