Ramtha Purification Station

  • Ramtha Purification Station

Ramtha Purification Station WWTP Project

The massive Ramtha wastewater treatment plat required an appropriately sized water containment pond to be built for optimal operation. HZE was contracted by the Ministry of Water and Irrigation, to fulfill the lining system requirements for this project.

HZE undertook the complete task of providing leak-proof installation. From supplying to testing the necessary HDPE 2 mm lining systems, all requirements were fulfilled in the given time frame. The entirety of the contract was done in accordance to the highest international standards

Quick Project Facts

LOCATION
Amman - Jordan

SURFACE ARES
80,000.00 m2

COMPLETED
2015

The Process

Project Overview

The first task of the Hassan Zureikat Establishment was to supply appropriate HDPE 2 mm lining for the object. After achieving this, our team became the installer of the lining system across 80,000.00 square meters of territory. After completing the second stage of the contract, ample testing was performed and the project was submitted for approval.

THE REQUIREMENTS

Every project features unique needs. For example, lining systems vary with each object, in layer count, thickness and type. We meet and exceed them.

HZE has been a leading supplier & installer of geosynthetic lining systems for over 40 years. We adhere to international standards and offer competitive pricing.