HZE was the contractor for providing, installing, and training geosythetic materials for this project that spanned over nineteen years. Working alongside Sukomi, our establishment labored to create capping for the landfill, to shield humans and the environment from contaminants.
At the time of completion, Al-Naameh became the region’s first and biggest sanitary landfill, carrying approximately 13M tons of sorted waste and creating an opportunity for transformation of the surrounding area.
Quick Project Facts
The Process
Project Overview
HZE participated in the final capping phase of the project by providing the installation of geotextile and geocomposite layers. After the design development, the cell was prepared by cutting, filling, and trimming in multiple layers. LLDPE 1MM was installed, followed by an HDPE drainage net, geocomposites, sand layer, and final capping.
THE REQUIREMENTS
Every project features unique needs. For example, lining systems vary with each object, in layer count, thickness and type. We meet and exceed them.
HZE has been a leading supplier & installer of geosynthetic lining systems for over 40 years. We adhere to international standards and offer competitive pricing.