The Future in a Construction. WorldWide.

Zeibar Project

  • Zeibar Project

Description

LOCATION
Lajoun-Karak, Jordan
SURFACE AREA
15000 m2
COMPLETED
December,2024

Project Overview

As part of the Ministry of Agriculture project, Hassan Zureikat Establishment (HZE) is overseeing the installation of 15,000 square meters of geogrid and white HDPE double side smooth geomembrane rolls. The geogrid is used to enhance soil stability and reinforcement, preventing erosion, and improving the structural integrity of the pond. The white HDPE liner serves as an impermeable barrier, ensuring water retention, preventing seepage, and protecting the pond from contamination. These advanced materials help optimize the efficiency and longevity of the pond.

THE REQUIREMENTS

This project’s technical requirements demand careful installation of the geogrid to reinforce soil, prevent erosion, and enhance structural stability. The white HDPE double side smooth geomembrane ensures impermeability and water retention while offering UV and chemical resistance to protect against contamination and degradation.

The white HDPE liner’s reflective surface minimizes heat absorption, preventing thermal expansion. Its smooth texture contributes to flexibility, longevity, and easier inspection and maintenance.

The use of high-performance geogrid and geomembrane materials supports long-term durability, environmental sustainability, and efficient water management.