As part of the Arab Potash Company’s East Expansion E project, Hassan Zureikat Establishment (HZE) is undertaking the precise installation of 200,000 square meters of bituminous geomembrane (BGM). This high-quality lining system enhances environmental protection by preventing seepage and ensuring structural integrity. The 4.8mm thick Coletanche BGM is being carefully deployed to meet international standards and project specifications.
Description
The Process
Project Overview
Working in collaboration with key stakeholders, including the Arab Potash Company, consultant Royal HaskoningDHV, and main contractor Eng. Zakaria Al Tarawneh, HZE is responsible for executing the lining works. Our team ensures precision in material installation, securing the BGM to the pond base, and delivering a durable solution that aligns with industry best practices.PROJECT REQUIREMENTS
Each project has specific technical requirements. For this project, the Coletanche BGM was selected due to its durability, impermeability, and adaptability to challenging site conditions.
Ensuring flawless installation of the 4.8mm BGM across a 200,000 m² surface requires meticulous handling, adherence to safety protocols, and strict quality control measures.
The bituminous geomembrane lining is designed to prevent seepage and protect the surrounding environment, reinforcing the project’s commitment to sustainability and regulatory compliance.